System: Liquid Natural Gas (LNG) Ammonia Pre-Cooler
Application: Energy Provider
Location: Australia
Date: October 2024
Result: 16.6% Performance Improvement – Reduced Production
Bottleneck on High Ambient Days
Case Study #7
System: Daikin Air-Cooled Chiller
Application: Hospital
Location: Singapore
Date: February 2023
Result: 24.3% Energy Savings
Case Study #8
System: Huawei Precision Cooling Air Conditioning
Application: Data Center
Location: Indonesia
Date: August 2023
Result: 7.3% Energy Savings
Case Study #9
System: Emerson Refrigeration Units
Application: Cold Room, Food Processing
Location: Thailand
Date: August 2023
Result: Process Improvements – able to increase cooling load (amount of product stored) by 32.5% without affecting energy consumption plus able to achieve 0°F temperature set-point much faster.